Abdullah Gül Üniversitesi Rektörü Prof. Dr. İhsan Sabuncuoğlu

Prof. Sabuncuoglu’nun araştırma alanları ve ders verdiği konular simülasyon, çizelgeleme ve üretim sistemleridir. 60’nin üzerinde uluslararası dergilerde yayınlanmış makaleleri, aralarında IIE Transactions, Decision Sciences, Simulation, International Journal of Production Research, International Journal of Flexible Manufacturing Systems, International Journal of Computer Integrated Manufacturing, European Journal of Operational Research, International Journal of Production Economics, Production Planning and Control, Journal of Operational Research Society, Journal of Intelligent Manufacturing, Computers and Operations Research ve Computers and Industrial Engineering’in de olduğu çeşitli dergilerde yayımlanmıştır.

Kendisi, International Journal of Operations and Quantitative Management ve Journal of Operations Management dergilerinin yayın kurulu üyesidir. Aynı zamanda, International Journal of Computer Integrated Manufacturing, Transactions on Operational Research ve International Journal of Systems Science adlı dergilerin yardımcı editörlüğünü üstlenmektedir.

Ayrıca, simülasyon ve üretim sistemleri üzerine iki kitabın incelemesini üstlenen Prof. Sabuncuoglu, Institute of Industrial Engineering, Simulation, Institute for Operations Research and the Management Science üyesidir.

Prof. Sabuncuoğlu’nun dergi yayınları

1. ArtificialNeuralNetworkModelingandSimulationofin-VitroNanoparticleand Cell Intercations” Journal of Computational and Theoretical Nanoscience ((forthcoming) with N. Cenk, S. Dayanik and G. Budak.

2. "A Joint Production and Transportation Planning Problem With Heterogeneous Vehicles", Journal of the Operational Research Society (forthcoming) with A. Toptal and U. Koc.

3. "A Class of Joint Production and Transportation Planning Problems Under Different Delivery Policies", Operations Research Letters (forthcoming) with A. Toptal and U. Koc.

4. "Optimization of Schedule Stability and Efficiency under Processing Time Variability and Random Machine Breakdowns in a Job Shop Environment”, Naval Research Logistics, Vol: 59, pp: 26-38, 2012, with S. Goren and U. Koc.

5. "A Prescription Fraud Detection Model”, Computer Methods and Programs in Biomedicine, April 2012, pp.37-46. with Aral, K.D.; Guvenir, and I.; Akar, A.R.

6. "Real Time Selection of Scheduling Rules and Knowledge Extraction via Dynamically Controlled Data Mining" International Journal of Production Research, Vol. 48, No.23, pp. 6909-6938 (2010), with G. Metan, H. Pierreval.

7. "Modeling and Analyzing Army Air assault Operations via Simulation" Simulation: Transactions of the Society for Modeling and Simulation International, Vol. 87, No.11, pp.1002-1014, 2012, wıth G. Virlan.

8. "Hybrid Petri-nets for Modeling and Performance Evaluation of Supply Chains" International Journal of Production Research, Vol. 49, No.15, pp.4627-4656 (2010), wıth N. Khilwani ve M. Tiwari.

9. "Distributed Scheduling: A Review of Concepts and Applications", International Journal of Production Research, Vol. 48, No. 18, 5235 – 5262, 2010, wıth A. Toptal.

10. "Optimization of Schedule Robustness or Stability under Random Machine Breakdowns and Processing Time Variability," IIE Transactions, Volume 42, Issue 3, sayfa 203- 220, 2010, wıth S. Gören.

11. "Two Exact Formulations for Disassembly Line Balancing Problem and Task Precedence Diagram Construction using AND/OR Graph” IIE Transactions, Vol.41, 866-881, 2009, with A. Koc and E. Erel.

12. S. Erenay, I. Sabuncuoglu, A. Toptal, and M.K. Tiwari, New Solution methods for Single Machine Bicriteria Scheduling Problem: Minimization of Average Flowtime and Number of Tardy Jobs, European Journal of Operational Research, Vol 201, 89-98, 2009.

13. "Ant Colony Optimization for the Single Model U-type Assembly Line Balancing Problem” International Journal of Production Ecomomics, Vol. 120, 287-300, 2009. with A. Alp and E. Erel.

14. "A multi-modal Discrete-Event Simulation Model for Military Deployment”, Simulation Modelling Practice and Theory, Vol. 17, pp 597-611 (2009), With Z. Yildirim; B.Tansel.

15."Hedging Production Schedules Against Uncertainity in Manufacturing Environment with a Review of Robustness and Stability Research”, International Journal of Computer Integrated Manufacturing, Vol.22, pp. 138- 157 (2009), with S. Goren

16."Robustness and Stability Measures for Scheduling: Single Machine Environment”, IIE Transactions , Vol.40, pp. 66-83 (2008), with S. Goren.

17."Variance Reduction Techniques: Experimental Comparison and Analysis for Single Systems", IIE Transactions, Vol. 40, pp. 538-551 (2008), with M. Fadiloglu and S. Celik.

18."Backtracking and Exchange of Information: Methods to enhance a Beam search Algorithm for assembly Line Scheduling”, European Journal Operational Research vol. 186, pp. 915-930 (2008), with. Y. Gockun and E. Erel.

19. "MAN Turkey Improves the Assembly Line Performance by Managing the In- House Parts” Interfaces - practice abstracts, with O. Alp, K. Erkoy, and B. Kara.

20."Mixed Model Assembly Line Sequencing Using Beam Search", International Journal of Production Research, Vol. 45, pp. 5265-5284, with E. Erel and Y. Gockun.

21."Simulation Modeling and Analysis of Border Security System”, European Journal Operational Research Vol. 180, pp. 1394-1410 (2007) with G. Celik.

22."Analysis of Serial Production Lines: Characterization Study and a New Heuristic Procedure for Optimal Buffer Allocation", International Journal of Production Research , Vol. 44, No.13, pp. 2499-2524, 2006, with E. Erel and Y. Gockun.

23."Analysis of the Behavior of Transient period in Non-terminating Simulations", European Journal of Operational Research, Vol. 173, 252-267 (2006), with B. Sandikci.

24."Modelling and Optimization of Army Fuel Supply System via Simulation”, Interfaces, Vol.35, No. 6, 474-482 (2005) with A. Hatip.

25."Evaluation of Mobilization and Deployment Plan of an Armored Battalion”, Journal of Military Operations Research, Vol. 10, No. 1, 43-63 (2005) with S. Muslum.

26.Stochastic Assembly Line Balancing using Beam Search", International Journal of Production Research, 43 (7), 1411-1426 (2005) with E. Erel and H. Sekerci.

27."Analyses of Serial Production Line Systems for Interdeparture Time Variability and WIP Inventory", International Journal of Quantitative Operations Management, Vol.10 No. 4, 43-63 (2004) with E. Erel and G. Kok.

28."Simulation Optimization: A Comprehensive Review on Theory and Applications", IIE Transactions, 36, 1067-1081 (2004), with E. Tekin.

29."Parameters Selection in Genetic Algorithms" Journal of Systemics, Cybernetics and Informatics, Vol. 2, No. 4 (2004) with O. Boyabatli.

30."An Evaluation of Operation Grouping Policies in FMS: An Simulation Study", International Journal Flexible Manufacturing Systems, Vol. 15, 217-239 (2003) with M. Lahmar.

31."Reactive Scheduling in a Dynamic and Stochatic FMS Environment", International Journal of Production Research, Vol. 41, No.17, 4211-4231 (2003) with O. Batuhan Kizilisik.

32."Simulation Analysis of Army Casuality Evacuation”, Simulation , Vol. 78, No.10, 612-625 (2002) with Ozgur Nuhut.

33."Operation-based Flow-time Estimation in Dynamic Job Shops", OMEGA, Vol. 30, 423-441 (2002) with A. Comlekci.

34."Simulation Metamodeling with Neural networks: An Experimental Investigation", International Journal of Production Research, Vol. 40, No. 11, 2483-2505 (2002) with Souheyl Touhami.

35."Analysis of Unbuffered Assembly Systems for Interdeparture Time Variability and Throughput," IIE Transactions , Vol. 34, 23-40 (2002), with E. Erel, G. Kok.

36."Effect of Load and Processing Time Variation on the Effectiveness of Scheduling Rules," International Journal of Production Research, Vol. 40, No.4, 945-974 (2002), with T. Lejmi.

37."Experimental Investigation of Iterative Simulation-based Scheduling in Dynamic and Stochastic Job Shop", Journal of Manufacturing Systems, Vol. 20, No. 4, 264-278 (2001), with E. Kutanoglu.

38."An Efficient Algorithm for the Single Machine Total Tardiness Scheduling Problem" IIE Transactions, Vol.33, 661-674 (2001) with B. Tansel and B. Yetis- Kara.

39."Balancing of U-type Assembly Systems Using Simulated Annealing," International Journal of Production Research, Vol.39, No.13, pp. 3003-3015, with E. Erel and A.B. Aksu.

40."Routing-based Reactive Scheduling Policies for Machine Failures in Job Shops," International Journal of Production Research, Vol. 39, No.14, pp. 3141- 3158 (2001), with E. Kutanoglu.

41."Analysis of Reactive Scheduling Problems in a Job Shop Environment" European Journal of Operational Research Vol. 126, No. 3, 567-586 (2000) with M. Bayiz.

42."Assembly Line Balancing Using Genetic Algorithms", Journal of Intelligent Manufacturing, Vol.11, 295-310 (2000) with E. Erel and M. Tanyer.

43."A Load-based and Due-date Oriented Approach to Order Review/Release in Job Shops" Decision Sciences , Vol. 31, No.2, 413-447 (2000) with Y. Karapinar.

44."Input Data Analysis Using Neural Networks" Simulation , Vol. 74, No. 3, 128- 137 (2000) with A. Yilmaz.

45."Rescheduling Frequency in an FMS with Uncertain Processing Times and Unreliable Machines" Journal of Manufacturing Systems, Vol. 18, No.4, 268- 283 (1999) with S. Karabuk.

46."Scheduling for Non-regular Performance Measure Under The Due Window Approach", OMEGA-International Journal of Management Sciences, Vol.27, 555-568 (1999) with T. Lejmi.

47."Analysis of Order Review /Release Problems in Production Systems", International Journal of Production Economics, Vol. 62, No.3, 259-279 (1999) with Y. Karapinar.

48."Job Shop Scheduling with Beam Search" European Journal of Operational Research, Vol 118, 390-412 (1999) with M. Bayiz.

49."An Analysis of Heuristics in a Dynamic Job Shop with Weighted Tardiness Objectives", International Journal of Production Research, Vol.37, No.1, 165- 188 (1999) with E. Kutanoglu.

50."A Beam Search based Algorithm and Evaluation of Scheduling Approaches", IIE Transactions , Vol.30, No. 2, pp.179-191 (1998) with S. Karabuk.

51."Scheduling with Neural Networks-A Review of the Literature and New Research Directions", Production and Inventory Control, Vol.9, No. 1, 2-12 (1998).

52."A Study on Scheduling Rules of Flexible Manufacturing Systems: A Simulation Approach", International Journal of Production Research , Vol.36, No. 2, 527- 546 (1998).

53."New Insights on the Single Machine Total tardiness Problem", Accepted for Publication by Journal of Operational Research Society, 28, 82-89 (1997) with B. Tansel.

54."A Neural Network Model for Scheduling Problems", European Journal of Operational Research, 93, 288-299 (1996) with B. Gurgun.

55."Endustri Mühendisliği Eğitiminde Labaratuvarın Önemi: Esnek Üretim Sistemleri ve Uygulamaları, Endüstri Mühendisliği Dergisi, Cilt 7, No. 4, 1996 (Turkish).

56."Experimental Investigation of an FMS Due-date Scheduling Problem: An Evaluation of Due-date Assignment Rules," International Journal of Computer Integrated Manufacturing, 8, 133-144 (1995) with D. Hommertzheim.

57."Experimental Investigation of an FMS Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules," International Journal of Flexible Manufacturing Systems, 5, 301-324 (1993) with D. Hommertzheim.

58."Dynamic Dispatching Algorithm for Scheduling Machines and AGVs in an FMS," International Journal of Production Research, 30, 1059-1079 (1992) with D. Hommertzheim.

59."Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-time Criterion", International Journal of Production Research, 30, 1617-1635 (1992) with D. Hommertzheim.

60."Training an Artificial Neural Network The Pure Pursuit Manoeuvre," Computers and Operations Research, 18, 343-353 (1991) with D. Hommertzheim, and J. Huffman.

61."An Expert System for Selecting Attribute Sampling Plans," International Journal of Computer Integrated Manufacturing, 3, 364-372 (1990) with N. Fard.

62."Expert Simulation Systems: Recent Developments and Applications in Flexible Manufacturing Systems," Computers and Industrial Engineering, 16, 575-585 (1989) with D. Hommertzheim.

63."A Heuristic Procedure for Single-item Dynamic Lot-sizing Problem," Computers and Industrial Engineering, 14,181-192 (1988) with O. Benli and S. Tufekci.